Project
System
Result
1
BOSS variant
2
Loop population
3
Load breakdown
4
Capacity calculation
A
Calculation basis
Trimmed means bias the measured average upward as a built-in
allowance. 79131 used the 50% figure to set the Intertek load resistors.
Applies to the recommended sizing only. The pass/fail verdict is
the as-installed result, because the certification test discharges the real system and
applies no margin of its own.
Pack → BBU → step-up converter → 48 V bus.
Measured 84–88% across the load range.